RAYSONHIGH PERFORMANCE COATINGSMALAYSIA
Rayson SealForce · Polyurea

Rayson SealForce SP210

Rayson SealForce SP210 is a hot spray-applied, 100% solids pure polyurea membrane that forms a seamless, potable-grade waterproof lining on concrete and steel tanks, reservoirs and containment structures.

ConcreteExposed structuresWet areas TDS RY-TDS-1104
Rayson SealForce SP210 pail
Best for

Best for potable-water tanks and reservoirs, sewage digesters, secondary containment and water towers needing a seamless, certified, fast-setting spray lining.

SealForce SP210 is Rayson's potable-grade spray polyurea: a two-component, 100% solids elastomer applied by heated spray plant that sets in seconds to a seam-free membrane on concrete and steel. It is certified for contact with drinking water (WRAS / BS 6920 in the UK), making it a lining as much as a coating.

The membrane develops high tensile strength and a hard, tough surface with strong tear and abrasion resistance, so it lines structures that see both water and mechanical wear. It walks on in minutes and reaches full cure within a few days, keeping tanks and containment out of service for the shortest possible time.

Typical duties are sealing concrete and steel tanks and structures, secondary containment linings, external waterproofing of water towers and reservoir roofs, and lining sewage digesters. It is placed at a 1:1 volume ratio by specialist spray applicators.

In Malaysia

Supplied by Epovex Coatings Sdn. Bhd., Company No. 202601042128 (1704223-A). The Malaysia launch is scheduled for 1 March 2027; confirm availability and lead time for your project. Installation through an authorised applicator in Johor, Kuala Lumpur or Penang introduced by Rayson, who quotes and warrants the workmanship, or by your own crew with Rayson’s application guidance.

Send an enquiry

Key benefits

  • Certified for potable-water contact (WRAS / BS 6920)
  • 100% solids, seamless membrane on concrete and steel
  • Hard, tough surface with strong tear and abrasion resistance
  • Fast set — walk-on in minutes
  • High tensile strength for lining structures under load

Recommended uses

  • Lining potable-water tanks and reservoirs
  • External waterproofing of water towers and reservoir roofs
  • Sealing concrete and steel tanks and structures
  • Secondary containment linings
  • Sewage digester linings

Application

  1. Hot airless spray (plural-component)
SpecificationData sheet value
Coverage1.0 litre/m² per mm dry film; typically 1.5 mm wet film in one coat
MixingTwo components metered and mixed in the heated spray gun at a 1:1 volume ratio (1.12:1 by weight); components pre-heated to ~25 °C and hoses controlled to about 70 °C; Part B power-mixed before use
Drying and curingGel time 5–20 s at 60 °C; walk-on ~10 minutes at 20 °C; light duty ~4 hours; 100% cure ~4 days (WRAS use requires 20 days at 7 °C minimum)
Pack sizes400 litre unit (Part A + Part B)

Typical systems

Potable tank / reservoir lining

  1. Prepare concrete or steel per the method statement and prime
  2. Spray-apply SealForce SP210 to the specified dry-film thickness
  3. Observe the full cure regime, including the extended cure for potable use
  4. Commission and fill after certification

Limitations

  • Applied only by specialist applicators with heated plural-component spray equipment
  • Apply above 3 °C over dew point and below 85% relative humidity
  • Shelf life is 6 months from shipment — check dates before use
  • Potable (WRAS) compliance requires the full specified cure regime
  • Store and apply components warm (around 25 °C) for correct spray

Not suitable for

  • Hand application by roller or brush
  • Application by non-specialist applicators without plural-component spray plant
  • Continuous service above its dry temperature limit
  • Long storage — plan around the 6-month shelf life

Used with

Jobs and industries

Jobs that use Rayson SealForce SP210

Rayson-authorised applicators in Johor, Kuala Lumpur and Penang install Rayson SealForce SP210 on these jobs and in these industries; its layer is marked in each build-up. Each page shows how the work runs, what to send for a quotation and what decides the price.

Waterproofing systems, applied by an applicator or bought direct

Waterproofing in Malaysia ↗
01 Rayson system Layers: SealForce RC40 polyurea, two layers, UV-stable and walkable; The primer its data sheet names for the surface; Roof or deck slab, cracks repaired, details reinforced

Polyurea waterproofing

SealForce polyureas: RC40 and RC30 rolled on for roofs, decks and planters, SP200 and the potable-grade SP210 hot-sprayed for tanks, containment and large roofs.

  1. SealForce RC40 polyurea, two layers, UV-stable and walkable
  2. The primer its data sheet names for the surface
  3. Roof or deck slab, cracks repaired, details reinforced

Decks, planters and car park decks: SealForce RC30, rolled on. Tanks, containment and large roofs: SealForce SP200, or the potable-grade SP210, hot-sprayed.

Quoted after inspection

By industry, across Malaysia

Industries we cover ↗
02 Rayson system Layers: PurScreed PC70 PU-cement screed, 1.5–3 mm; Concrete slab, prepared, coves and drains detailed

Food and beverage factory floors

Hot washdown, wet process and dry store floors for food and beverage plants, with coves and drains detailed.

  1. PurScreed PC70 PU-cement screed, 1.5–3 mm
  2. Concrete slab, prepared, coves and drains detailed

Dry stores and packing: FloorGuard R50 or LevelShield SL120 over PrimeBond E20. Walls: UraForce WB58. Water tanks and effluent pits: SealForce SP210 or SP200, sprayed.

Quoted after inspection
The practical details

Rayson SealForce SP210: questions people ask

Is SealForce SP210 approved for drinking water?

Yes — it is certified for potable-water contact (WRAS to BS 6920 in the UK). Potable compliance depends on following the full specified cure regime, which our technical team will confirm for your project.

How is it applied?

By specialist applicators using heated plural-component spray equipment, metering the two parts at a 1:1 volume ratio with hoses controlled to around 70 °C. It is not a hand-applied product.

How quickly can a tank return to service?

It walks on in about ten minutes and takes light duty within hours, with full cure in a few days — though potable-water certification requires an extended cure period before filling.

What is its shelf life?

About six months from shipment when kept in sealed original containers in a dry store. Because that is shorter than many coatings, plan deliveries to the programme and check dates before spraying.

How does it differ from SealForce SP200?

Both are sprayed pure polyureas. SP210 is selected where drinking-water certification and a hard, abrasion-tough tank lining are the priority; SP200 is the general-purpose sprayed membrane for below-grade, marine and containment waterproofing.

Start a conversation / ↗

Send the job, or ask for materials

Tell us what the surface is, where it is and what it has to withstand. Rayson replies with a system recommendation; for installation, the applicator for your area in Johor, Kuala Lumpur or Penang is introduced to quote the job.

Malaysia launch: 1 March 2027. Enquiries are welcome now; supply, site assessment and installation timing are confirmed for each project.

Thank you. Your enquiry has been received and we reply within one working day, Monday to Friday.

WhatsApp