Exterior PU deck system
- Prime prepared concrete with 2 coats of Rayson PrimeBond S30
- Finish with 2 coats of Rayson UraForce SB72 UV-stable polyurethane
Rayson PrimeBond S30 is a two-part, low-viscosity, solvent-based epoxy primer that penetrates and seals prepared concrete, pavements and mineral substrates before coating.

PrimeBond S30 uses a low-viscosity, solvent-based epoxy formulation to soak into prepared concrete and bind the surface before the floor system goes down. The two parts mix 1:1 and react to form a long-lasting sealing coat with excellent adhesion — pull-off testing on prepared concrete produces failure in the concrete, not the primer.
Its penetration makes it well suited to dense concrete, where two thin coats wet out the surface far better than one heavy application, and to porous or highly absorbent substrates such as pavements, ramps and loading bays. The cured film shows excellent impact and chemical resistance.
As a solvent-based product, PrimeBond S30 needs adequate ventilation during application and cure. For occupied buildings or enclosed spaces where odour is a constraint, consider the solvent-free PrimeBond E20 or water-based PrimeBond W10 instead.
Supplied by Epovex Coatings Sdn. Bhd., Company No. 202601042128 (1704223-A). The Malaysia launch is scheduled for 1 March 2027; confirm availability and lead time for your project. Installation through an authorised applicator in Johor, Kuala Lumpur or Penang introduced by Rayson, who quotes and warrants the workmanship, or by your own crew with Rayson’s application guidance.
Send an enquiry| Specification | Data sheet value |
|---|---|
| Coverage | 5–6 m² per litre per coat; minimum 2 coats on normal or dense concrete — varies with substrate porosity |
| Mixing | Two pre-weighed parts, mix ratio 1:1 by weight; mix mechanically for at least 2–3 minutes; pot life up to 30 minutes at 28 °C |
| Drying and curing | Final cure 7 days; minimise heavy traffic for 8 hours after application on pavements |
| Pack sizes | Part A 10 litres / Part B 10 litres per set |
Rayson-authorised applicators in Johor, Kuala Lumpur and Penang install Rayson PrimeBond S30 on these jobs and in these industries; its layer is marked in each build-up. You can also order it direct and apply it yourself, with the step-by-step guide. Each page shows how the work runs, what to send for a quotation and what decides the price.
Floor systems, laid by an applicator or bought direct
All floor systems ↗PurScreed PC70 PU-cement screed for hot, wet and chemical floors, and six UraForce PU coatings, clear or coloured, indoors and out; laid or sold direct.
Colour that must not yellow in daylight: UraForce WB58 over an R50 body coat. Outdoors: UraForce SB72 over PrimeBond S30. The concrete look: UraForce WB60 or SB65, clear.
Quoted after inspectionStop a concrete floor dusting: UraForce WB60 clear indoors, SB65 clear outdoors, or a coloured HydroShield WE40 or WE45 seal coat; laid or sold direct.
Outdoors and on stone: UraForce SB65 clear. A coloured seal coat: HydroShield WE40 or WE45, its own primer.
Quoted after inspectionOrder it direct, with a step-by-step guide
FloorGuard R50 over PrimeBond E20, or water-based HydroShield WE40, sold direct with a step-by-step guide: apply it yourself, or have the applicator do it.
Ramps: aggregate broadcast into the first coat for grip. Water-based: HydroShield WE40, its own primer. Porches open to the sun: UraForce SB72 over PrimeBond S30.
Quoted per orderJobs in Johor
Garages, kitchens, living rooms and porches: plain coloured epoxy by Rayson, IFS metallic and flake finishes over Rayson primer.
Metallic and flake finishes: IFS Metallic Epoxy or Epoxy Flake Lining, over the same primer.
Quoted after inspectionJobs in Kuala Lumpur and Selangor
Kuala Lumpur and Selangor ↗Factory, warehouse, car park, showroom and home floors in the Klang Valley, with the Rayson system named for the traffic.
Storage halls, workshops and garages: FloorGuard R50, two coats. Hot washdown: PurScreed PC70. Showrooms: R50 under UraForce WB58. Open porches and top decks: UraForce SB72 over PrimeBond S30.
Quoted after inspectionBy industry, across Malaysia
Industries we cover ↗Basement, covered and open car park decks, ramps and walkways in condos, malls, offices and factories: textured epoxy, UV-stable PU and deck waterproofing.
Pedestrian walkways: GripSafe AP12. Open top deck: UraForce SB72 over PrimeBond S30. A deck that leaks into the level below: SealForce RC30 under the wearing layers.
Quoted after inspectionService bays, wash bays and car showrooms: hard-wearing epoxy in the workshop, a colour-stable finish in the showroom.
Wash bays and ramps: R50 broadcast with aggregate. Showrooms: UraForce WB58 topcoat over R50. Forecourt: UraForce SB72 over PrimeBond S30. Heaviest bays: LevelShield SL120.
Quoted after inspectionDense, power-floated concrete absorbs very little primer, and porous concrete absorbs unevenly. Two thinner coats achieve consistent wetting and a uniform seal, which prevents defects in the finish coats above.
Only with adequate ventilation during application and cure — it is solvent-based. For enclosed or occupied areas, PrimeBond E20 (solvent-free) or PrimeBond W10 (water-based) are the safer choices.
Keep heavy traffic off for at least 8 hours after application on pavements, and note the primer itself is not the wearing surface — full return to service depends on the complete system. Confirm programme timings with our technical team.
Mechanical preparation by shot blasting, milling or diamond grinding to a sound, open surface, with weak concrete removed, defects patched and all dust vacuumed off.
Substrate moisture must not exceed 5%. For slabs that cannot meet this, PrimeBond E20 tolerates damp surfaces — discuss the slab condition with our technical team.
Tell us what the surface is, where it is and what it has to withstand. Rayson replies with a system recommendation; for installation, the applicator for your area in Johor, Kuala Lumpur or Penang is introduced to quote the job.
Malaysia launch: 1 March 2027. Enquiries are welcome now; supply, site assessment and installation timing are confirmed for each project.