Can you do it overnight?
For a plain coloured floor on a prepared slab, often yes, with foot traffic the next morning and fittings after cure. The quotation states what can be done in one night and what needs two.
Larger floors are done in sections over several nights, or in one go during a fit-out before the fittings arrive.