Standard epoxy floor system
- Mechanically prepare and vacuum the substrate
- Prime with Rayson PrimeBond E20
- Apply Rayson LevelShield SL120 self-levelling body coat
Rayson PrimeBond E20 is a two-component, medium-viscosity, solvent-free epoxy bonding primer that anchors resin floor systems to concrete, screed, asphalt and prepared metal — on dry or damp substrates.

PrimeBond E20 is the workhorse primer of the Rayson range. A medium-viscosity, solvent-free two-component epoxy, it penetrates mechanically prepared substrates and forms the adhesion bridge that the rest of the floor system depends on. In pull-off testing on properly prepared concrete, bond strength exceeds the cohesive strength of the concrete itself — failure occurs in the substrate, not the primer.
The formulation tolerates damp (though not wet) surfaces, which matters on ground-bearing slabs and in tropical conditions where full drying is rarely practical. It also handles new concrete, existing epoxy floors, cementitious screeds, asphalt and mechanically prepared metal, making it the default first coat across most Rayson floor build-ups.
Because it is solvent-free, PrimeBond E20 is suitable for use in enclosed and poorly ventilated areas — basements, plant rooms and occupied buildings — where solvent-based primers would be ruled out.
Supplied by Epovex Coatings Sdn. Bhd., Company No. 202601042128 (1704223-A). The Malaysia launch is scheduled for 1 March 2027; confirm availability and lead time for your project. Installation through an authorised applicator in Johor, Kuala Lumpur or Penang introduced by Rayson, who quotes and warrants the workmanship, or by your own crew with Rayson’s application guidance.
Send an enquiry| Specification | Data sheet value |
|---|---|
| Coverage | 6–8 m² per kg per coat, varying with substrate condition and porosity |
| Mixing | Two pre-weighed parts, mix ratio 2:1 (A:B) by weight; mix mechanically for at least 2–3 minutes; pot life up to 30 minutes at 30 °C |
| Drying and curing | Final cure 7 days |
| Pack sizes | Part A 13.34 kg can + Part B 6.66 kg can |
Rayson-authorised applicators in Johor, Kuala Lumpur and Penang install Rayson PrimeBond E20 on these jobs and in these industries; its layer is marked in each build-up. You can also order it direct and apply it yourself, with the step-by-step guide. Each page shows how the work runs, what to send for a quotation and what decides the price.
Order it direct, with a step-by-step guide
FloorGuard R50 over PrimeBond E20, sold direct with a step-by-step guide: apply it yourself, or have the applicator do it.
Ramps: aggregate broadcast into the first coat for grip. Porches open to the sun: not this system.
Quoted per orderJobs in Johor
Forklift aisles, production floors and loading bays in Johor’s industrial parks, specified by the maker.
Storage halls: FloorGuard R50 roller coat. Hot washdown or spillage: PurScreed PC70.
Quoted after inspectionGarages, kitchens, living rooms and porches: plain coloured epoxy by Rayson, IFS metallic and flake finishes over Rayson primer.
Metallic and flake finishes: IFS Metallic Epoxy or Epoxy Flake Lining, over the same primer.
Quoted after inspectionSeamless, cleanable floors done overnight or between tenancies, with colour that lasts under daylight.
GripSafe AP12 texture at the entrance and wet zones.
Quoted after inspectionMachining halls, timber stores, packing and container loading, finishing lines and buyer showrooms in the furniture factories of Muar and Batu Pahat.
Timber and board stores: FloorGuard R50. Showroom: R50 under UraForce WB58, or an IFS finish. Finishing lines: after the chemical check.
Quoted after inspectionSeamless cement finish over floors, walls and showers, with Rayson waterproofing underneath where it is wet.
Dry floors: PrimeBond E20 primer in place of the membrane, or a bonding primer over firmly bonded tiles.
Quoted after inspectionIFS Japanese terrazzo, poured in place, for homes, lobbies and shops, on a base prepared with Rayson materials.
Natural pebbles in clear resin for car porches, paths and pool surrounds, with the waterproofing underneath done first.
Speckled flake and seamless metallic or marbled epoxy floors from the IFS range, laid over Rayson primer.
Firmly bonded tiles: grout lines filled and a bonding primer first.
Quoted after inspectionThe polished concrete look over your existing floor or wall, without breaking it out: the IFS overlay on a prepared base.
Wet areas: the applicator confirms whether a SealForce WB20 membrane goes underneath first.
Quoted after inspectionJobs in Kuala Lumpur and Selangor
Kuala Lumpur and Selangor ↗Factory, warehouse, car park, showroom and home floors in the Klang Valley, with the Rayson system named for the traffic.
Storage halls, workshops and garages: FloorGuard R50, two coats. Hot washdown: PurScreed PC70. Showrooms: R50 under UraForce WB58.
Quoted after inspectionBy industry, across Malaysia
Industries we cover ↗Hot washdown, wet process and dry store floors for food and beverage plants, with coves and drains detailed.
Dry stores and packing: FloorGuard R50 or LevelShield SL120 over PrimeBond E20. Walls: UraForce WB58.
Quoted after inspectionBasement and covered car park decks, ramps and walkways in condos, malls, offices and factories, with a textured epoxy deck system.
Pedestrian walkways: GripSafe AP12. Open, sun-exposed top decks: outside the current range.
Quoted after inspectionForklift aisles, racking zones and loading bays in warehouses and distribution centres, in self-levelling or roller-applied epoxy.
Racking and storage zones: FloorGuard R50 roller coats. Heavy traffic with spillage: PurScreed PC70.
Quoted after inspectionESD floors, plant rooms, loading bays, car parks and roofs for data centres in Johor and across Malaysia.
Plant rooms and loading bays: LevelShield SL120. Car parks: FloorGuard R50 broadcast system. Roofs: SealForce RC40.
Quoted after inspectionCooking lines, dishwash and prep areas in central, hotel and restaurant kitchens: PU-cement where it is hot, epoxy where it is dry.
Cold prep, stores and corridors: FloorGuard R50 broadcast with aggregate, over PrimeBond E20.
Quoted after inspectionService bays, wash bays and car showrooms: hard-wearing epoxy in the workshop, a colour-stable finish in the showroom.
Wash bays and ramps: R50 broadcast with aggregate. Showrooms: UraForce WB58 topcoat over R50. Heaviest bays: LevelShield SL120.
Quoted after inspectionProduction rooms, clean rooms, device assembly, washdown rooms and stores in pharmaceutical and medical device plants, with smooth, cleanable floors and walls.
Walls: UraForce WB58. ESD assembly: StaticGuard CX90. Washdown rooms: PurScreed PC70.
Quoted after inspectionESD areas, production halls, wet and chemical rooms, warehouses and car parks in electronics and semiconductor plants, zone by zone.
Outside the ESD programme: LevelShield SL120. Wet and chemical rooms: PurScreed PC70. Car parks: FloorGuard R50 broadcast system.
Quoted after inspectionClassrooms, corridors, halls, walkways, playgrounds, toilets, canteens and roofs in schools and kindergartens, done in the school holidays.
Walkways, ramps and playgrounds: GripSafe AP12. Toilets: SealForce WB20 under the tiles.
Quoted after inspectionDecorative finishes in KL, Selangor and Penang
The IFS partner range ↗Seamless IFS MicroCrete® for condo bathrooms, floors and walls, with Rayson waterproofing under every wet area.
Dry rooms: PrimeBond E20 on concrete or screed, or a bonding primer over firmly bonded tiles, in place of the membrane.
Quoted after inspectionThe polished concrete and simen kilat look over the floor you already have: the IFS overlay, or IFS’s polished concrete slab for a new floor.
A new floor: IFS polished concrete slab, at least 25 mm (IFS). Wet areas: the applicator confirms whether SealForce WB20 goes underneath first.
Quoted after inspectionIFS Japanese terrazzo, poured in place with no grout lines, for homes, lobbies and shops, on a base prepared with Rayson materials.
Speckled epoxy flake and seamless metallic epoxy floors from the IFS range, for homes, garages and showrooms, over Rayson primer.
Firmly bonded tiles: grout lines filled and a bonding primer first.
Quoted after inspectionYes — it is formulated for dry or damp substrates, provided there is no standing water and substrate moisture does not exceed 5%. For slabs above that, or with active moisture ingress, speak to our technical team before specifying.
In almost all cases, yes. The primer seals porosity, prevents pinholing in the body coat and provides the adhesion the whole system relies on. Skipping it is the most common cause of coating failure.
The primer must be firm enough to walk on but still within its overcoat window. Confirm exact recoat times with our technical team for your programme.
PrimeBond E20 is solvent-free and stated as suitable for unventilated areas. Standard PPE and good working practice still apply; consult the SDS once available.
Mechanical preparation — captive shot blasting, milling or diamond grinding — to a sound, open, dust-free surface. Weak concrete must be removed, defects filled, and all dust vacuumed off before priming.
Yes, provided the existing coating is sound and well bonded. Abrade the surface, clean thoroughly and carry out an adhesion trial first.
Tell us what the surface is, where it is and what it has to withstand. Rayson replies with a system recommendation; for installation, the applicator for your area in Johor, Kuala Lumpur or Penang is introduced to quote the job.
Malaysia launch: 1 March 2027. Enquiries are welcome now; supply, site assessment and installation timing are confirmed for each project.