RAYSONHIGH PERFORMANCE COATINGSMALAYSIA
Rayson UraForce · Polyurethane

Rayson UraForce WB52

Rayson UraForce WB52 is a two-component, water-based aliphatic urethane floor topcoat — low-VOC, low-odour and UV-resistant — that can be combined with broadcast aggregate for an anti-slip finish.

ConcreteCement screedWalls TDS RY-TDS-706
Rayson UraForce WB52 pail
Best for

Best for durable, low-odour floor topcoats in schools, offices, retail and car park areas, over Rayson PrimeBond W10 primer.

UraForce WB52 is the finish coat of the Rayson water-based floor system. The two-component aliphatic urethane cures to a high-strength film with excellent abrasion resistance, low dirt pick-up, pencil hardness above H and gloss of 85 at 60° in the gloss grade — while staying low-VOC and low-odour for occupied buildings.

Preliminary laboratory testing records Class 5 staining resistance against used engine oil, olive oil, coffee with milk and black rubber, skid resistance of at least 70 SRV in the anti-slip build-up, and 1,000 hours of QUV accelerated weathering — a non-yellowing finish for interior or exterior floors and walls.

Applied over PrimeBond W10, with an optional aggregate broadcast for anti-slip texture, it is surface dry in about 2 hours and trafficable in about 3 at 28 °C, which keeps overnight and holiday programmes realistic. Gloss, satin and matt grades are available.

In Malaysia

Supplied by Epovex Coatings Sdn. Bhd., Company No. 202601042128 (1704223-A). The Malaysia launch is scheduled for 1 March 2027; confirm availability and lead time for your project. Installation through an authorised applicator in Johor, Kuala Lumpur or Penang introduced by Rayson, who quotes and warrants the workmanship, or by your own crew with Rayson’s application guidance.

Send an enquiry

Key benefits

  • Low VOC and low odour — occupied-building friendly
  • Excellent abrasion and staining resistance (Class 5, preliminary testing)
  • Non-yellowing with 1,000 h QUV weathering performance (preliminary testing)
  • Fast trafficable time supports overnight programmes

Recommended uses

  • UV-resistant topcoat for concrete floors
  • Topcoat finishes on hard surfaces such as stone and limestone
  • Hygienic coatings for walls and floors
  • Anti-slip walkway and ramp systems with broadcast aggregate

Application

  1. Short-bristled brush
  2. Roller
SpecificationData sheet value
MixingTwo pre-weighed parts, mix ratio as shown on the supplied set size (4:1 or 9:1 A:B by weight); stir parts separately, combine and mix with a slow-speed drill and paddle until uniform; pot life 6 hours at 25 °C
Drying and curingSurface dry 2 hours at 28 °C; trafficable after 3 hours
Pack sizesPart A 4 kg or 18 kg pail + Part B 1 kg or 2 kg pail

Typical systems

Low-odour floor system

  1. Prime with Rayson PrimeBond W10
  2. Apply minimum 2 coats of Rayson UraForce WB52

Anti-slip system

  1. Prime with Rayson PrimeBond W10 and broadcast fine aggregate into the wet primer
  2. Sweep off excess after drying and seal with minimum 2 coats of Rayson UraForce WB52

Limitations

  • Minimum substrate temperature 5 °C; minimum mixing temperature 10 °C; minimum curing temperature 5 °C
  • Mixed material must be used within its pot life; cures faster in hot weather and in large batches
  • Performance data supported by laboratory testing
  • Thin-film topcoat — apply minimum 2 coats over the primed system

Not suitable for

  • Heavy forklift or industrial traffic without an appropriate body coat
  • Chemical containment or immersion service
  • Unprimed, unprepared substrates

Used with

Jobs and industries

Jobs that use Rayson UraForce WB52

Rayson-authorised applicators in Johor, Kuala Lumpur and Penang install Rayson UraForce WB52 on these jobs and in these industries; its layer is marked in each build-up. Each page shows how the work runs, what to send for a quotation and what decides the price.

Floor systems, laid by an applicator or bought direct

All floor systems ↗
01 Rayson system Layers: PurScreed PC70 PU-cement screed, 1.5–3 mm; Concrete slab, prepared, coves and drains detailed

PU flooring

PurScreed PC70 PU-cement screed for hot, wet and chemical floors, and six UraForce PU coatings, clear or coloured, indoors and out; laid or sold direct.

  1. PurScreed PC70 PU-cement screed, 1.5–3 mm
  2. Concrete slab, prepared, coves and drains detailed

Colour that must not yellow in daylight: UraForce WB58 over an R50 body coat. Outdoors: UraForce SB72 over PrimeBond S30. The concrete look: UraForce WB60 or SB65, clear.

Quoted after inspection

Jobs in Johor

02 Rayson system Layers: UraForce WB58 topcoat, colour-stable in daylight; FloorGuard R50 epoxy in the shop’s colour; PrimeBond E20 epoxy primer; Concrete floor, degreased and keyed

Shop, café and showroom floors

Seamless, cleanable floors done overnight or between tenancies, with colour that lasts under daylight.

  1. UraForce WB58 topcoat, colour-stable in daylight
  2. FloorGuard R50 epoxy in the shop’s colour
  3. PrimeBond E20 epoxy primer
  4. Concrete floor, degreased and keyed

GripSafe AP12 texture at the entrance and wet zones. The raw concrete look: UraForce WB60 clear on the bare slab.

Quoted after inspection
03 Rayson system Layers: GripSafe AP12 quartz anti-slip texture; Concrete or asphalt, cleaned and keyed

Anti-slip floor treatment

Ramps, walkways, porches, pool decks and wet rooms made safe underfoot.

  1. GripSafe AP12 quartz anti-slip texture
  2. Concrete or asphalt, cleaned and keyed

Colour: UraForce HY15 over AP12. Coated floors: quartz broadcast into the epoxy finish. Glazed tiles: a tile treatment, quoted on inspection.

Quoted after inspection

By industry, across Malaysia

Industries we cover ↗
04 Rayson system Layers: Tiles, re-laid after the ponding test; Tile bed; SealForce WB20, two coats, turned up the walls; Screed to falls; Floor slab

Hospital, clinic and care home floors

Corridors, service areas, kitchens, laundries, wet rooms, ramps and car parks in hospitals, clinics and care homes, laid in occupied buildings.

  1. Tiles, re-laid after the ponding test
  2. Tile bed
  3. SealForce WB20, two coats, turned up the walls
  4. Screed to falls
  5. Floor slab

Corridors and service areas: LevelShield SL120 or FloorGuard R50. Rooms that reopen the same day: UraForce WB52 over PrimeBond W10. Kitchens and laundries: PurScreed PC70. Walls: UraForce WB58.

Quoted after inspection
05 Rayson system Layers: UraForce WB58 topcoat, colour-stable; FloorGuard R50 epoxy in a colour from the range; PrimeBond E20 epoxy primer; Concrete floor, keyed and repaired

School and kindergarten floors

Classrooms, corridors, halls, walkways, playgrounds, courts, toilets, canteens and roofs in schools and kindergartens, done in the school holidays.

  1. UraForce WB58 topcoat, colour-stable
  2. FloorGuard R50 epoxy in a colour from the range
  3. PrimeBond E20 epoxy primer
  4. Concrete floor, keyed and repaired

Walkways, ramps and playgrounds: GripSafe AP12, coloured with UraForce HY15. Courts: CourtFlex AC25. Toilets: SealForce WB20 under the tiles.

Quoted after inspection
The practical details

Rayson UraForce WB52: questions people ask

How quickly can a coated area reopen?

Indicatively surface dry in 2 hours and trafficable in about 3 at 28 °C. Allow longer before wet cleaning or heavy use; confirm programme timings with our technical team.

Does it resist staining?

Testing records Class 5 staining resistance against used engine oil, olive oil, coffee with milk and black rubber — strong results.

How is the anti-slip version built?

Broadcast fine aggregate into the wet PrimeBond W10 primer, sweep off the excess when dry, then seal with two coats of WB52. Preliminary testing on this build-up records at least 70 SRV skid resistance.

Is it suitable for exterior use?

Yes — the aliphatic urethane is non-yellowing and has run 1,000 hours of QUV accelerated weathering in preliminary testing.

What primer does it need?

Rayson PrimeBond W10 is the matched water-based primer for this system.

What sheens are available?

Gloss, satin and matt.

Start a conversation / ↗

Send the job, or ask for materials

Tell us what the surface is, where it is and what it has to withstand. Rayson replies with a system recommendation; for installation, the applicator for your area in Johor, Kuala Lumpur or Penang is introduced to quote the job.

Malaysia launch: 1 March 2027. Enquiries are welcome now; supply, site assessment and installation timing are confirmed for each project.

Thank you. Your enquiry has been received and we reply within one working day, Monday to Friday.

WhatsApp