Coloured low-odour floor finish
- Prime or seal with Rayson HydroShield WE40 (system pairing to be confirmed by the Rayson technical team)
- Apply minimum 2 coats of Rayson UraForce WB58, stripe-coating edges by brush
Rayson UraForce WB58 is a two-component, water-based aliphatic polyurethane dispersion topcoat, crosslinked with a PUR hardener, for abrasion-resistant coloured finishes on concrete, metal and mineral surfaces.

UraForce WB58 brings aliphatic polyurethane performance to water-based application. The pigmented polyurethane dispersion crosslinks with its PUR hardener into a film with excellent abrasion resistance, low dirt pick-up, good water repellence and pencil hardness above H — a working finish that dustproofs and protects the substrate.
It is supplied in colours including grey, and adheres to mechanically prepared concrete, metal, stone and limestone. Typical duties are UV-resistant coloured coatings for concrete floors, hygienic washable coatings for walls, and non-yellowing topcoat finishes across commercial and educational interiors.
Mix ratio is 9:1 by weight with a pot life of 1–2 hours, applied by brush or roller in a minimum of two coats.
Supplied by Epovex Coatings Sdn. Bhd., Company No. 202601042128 (1704223-A). The Malaysia launch is scheduled for 1 March 2027; confirm availability and lead time for your project. Installation through an authorised applicator in Johor, Kuala Lumpur or Penang introduced by Rayson, who quotes and warrants the workmanship, or by your own crew with Rayson’s application guidance.
Send an enquiry| Specification | Data sheet value |
|---|---|
| Mixing | Two pre-weighed parts, mix ratio 9:1 by weight; stir parts separately, combine and mix with a slow-speed drill and paddle for 1–2 minutes; pot life 1–2 hours |
| Drying and curing | Surface dry 6 hours at 25 °C |
| Pack sizes | Part A 4 Lt or 18 Lt pail + Part B 1 Lt or 2 Lt pail |
Rayson-authorised applicators in Johor, Kuala Lumpur and Penang install Rayson UraForce WB58 on these jobs and in these industries; its layer is marked in each build-up. Each page shows how the work runs, what to send for a quotation and what decides the price.
Jobs in Johor
Garages, kitchens, living rooms and porches: plain coloured epoxy by Rayson, IFS metallic and flake finishes over Rayson primer.
Metallic and flake finishes: IFS Metallic Epoxy or Epoxy Flake Lining, over the same primer.
Quoted after inspectionSeamless, cleanable floors done overnight or between tenancies, with colour that lasts under daylight.
GripSafe AP12 texture at the entrance and wet zones.
Quoted after inspectionMachining halls, timber stores, packing and container loading, finishing lines and buyer showrooms in the furniture factories of Muar and Batu Pahat.
Timber and board stores: FloorGuard R50. Showroom: R50 under UraForce WB58, or an IFS finish. Finishing lines: after the chemical check.
Quoted after inspectionJobs in Kuala Lumpur and Selangor
Kuala Lumpur and Selangor ↗Factory, warehouse, car park, showroom and home floors in the Klang Valley, with the Rayson system named for the traffic.
Storage halls, workshops and garages: FloorGuard R50, two coats. Hot washdown: PurScreed PC70. Showrooms: R50 under UraForce WB58.
Quoted after inspectionBy industry, across Malaysia
Industries we cover ↗Hot washdown, wet process and dry store floors for food and beverage plants, with coves and drains detailed.
Dry stores and packing: FloorGuard R50 or LevelShield SL120 over PrimeBond E20. Walls: UraForce WB58.
Quoted after inspectionCooking lines, dishwash and prep areas in central, hotel and restaurant kitchens: PU-cement where it is hot, epoxy where it is dry.
Cold prep, stores and corridors: FloorGuard R50 broadcast with aggregate, over PrimeBond E20.
Quoted after inspectionService bays, wash bays and car showrooms: hard-wearing epoxy in the workshop, a colour-stable finish in the showroom.
Wash bays and ramps: R50 broadcast with aggregate. Showrooms: UraForce WB58 topcoat over R50. Heaviest bays: LevelShield SL120.
Quoted after inspectionProduction rooms, clean rooms, device assembly, washdown rooms and stores in pharmaceutical and medical device plants, with smooth, cleanable floors and walls.
Walls: UraForce WB58. ESD assembly: StaticGuard CX90. Washdown rooms: PurScreed PC70.
Quoted after inspectionCorridors, service areas, kitchens, laundries, wet rooms, ramps and car parks in hospitals, clinics and care homes, laid in occupied buildings.
Corridors and service areas: LevelShield SL120 or FloorGuard R50. Kitchens and laundries: PurScreed PC70. Walls: UraForce WB58.
Quoted after inspectionClassrooms, corridors, halls, walkways, playgrounds, toilets, canteens and roofs in schools and kindergartens, done in the school holidays.
Walkways, ramps and playgrounds: GripSafe AP12. Toilets: SealForce WB20 under the tiles.
Quoted after inspectionWater-based application: it can go into occupied and enclosed spaces without solvent odour, while keeping the abrasion resistance and UV performance of aliphatic PU chemistry.
It is supplied pigmented, with grey among the colours offered. Confirm the current colour range with our sales team.
A minimum of two coats by brush or roller, stripe-coating edges first.
Confirm coverage with our technical team when planning quantities.
Sealed, dry and under cover — the PUR hardener is moisture-sensitive and has a shorter shelf life than the base component.
Tell us what the surface is, where it is and what it has to withstand. Rayson replies with a system recommendation; for installation, the applicator for your area in Johor, Kuala Lumpur or Penang is introduced to quote the job.
Malaysia launch: 1 March 2027. Enquiries are welcome now; supply, site assessment and installation timing are confirmed for each project.