RAYSONHIGH PERFORMANCE COATINGSMALAYSIA
Rayson PatchBond · Epoxy

Rayson MortarBond EM90

Rayson MortarBond EM90 is a three-pack, solvent-free epoxy mortar — resin, hardener and graded aggregate — that reinstates concrete floors with a non-shrink, highly abrasion-resistant repair.

Concrete TDS RY-TDS-901
Rayson MortarBond EM90 pail
Best for

Best for trowel-applied repair and reinstatement of damaged concrete floors before coating, and for building durable epoxy mortar patches in trafficked areas.

MortarBond EM90 rebuilds damaged concrete with epoxy strength. The three components — resin, hardener and graded aggregate — combine into a trowelable mortar that hardens without shrinkage to a compressive strength of 80 N/mm² at 7 days, well above the concrete around it.

The cured mortar is highly durable and tough, with high abrasion resistance, good adhesion and good resistance to chemicals and solvents — so patches, joint arrises and worn areas repaired with EM90 stay put under forklift traffic rather than breaking out again.

It is applied by steel trowel over a compatible epoxy primer and is typically overcoated by the floor system, keeping repairs invisible inside the finished floor.

In Malaysia

Supplied by Epovex Coatings Sdn. Bhd., Company No. 202601042128 (1704223-A). The Malaysia launch is scheduled for 1 March 2027; confirm availability and lead time for your project. Installation through an authorised applicator in Johor, Kuala Lumpur or Penang introduced by Rayson, who quotes and warrants the workmanship, or by your own crew with Rayson’s application guidance.

Send an enquiry

Key benefits

  • Non-shrink repair with compressive strength of 80 N/mm² at 7 days
  • Tough, highly abrasion-resistant — survives forklift traffic
  • Good resistance to chemicals and solvents
  • Solvent-free, three-pack system with good adhesion

Recommended uses

  • Repairing spalls, potholes and worn areas in concrete floors
  • Reinstating joint edges and arrises before coating
  • Forming durable epoxy mortar patches in trafficked areas

Application

  1. Steel trowel
SpecificationData sheet value
MixingMix ratio Part A : Part B : Part C = 2 : 1 : 30 by kg; no thinner required; pot life 45 minutes at 30 °C
Drying and curingTouch dry 4 hours at 30 °C; hard dry 16 hours; full cure 7 days
Pack sizes33 kg set (Part A 2 kg resin, Part B 1 kg hardener and Part C 30 kg aggregate)

Typical systems

Floor repair and recoat

  1. Cut back and mechanically prepare the damaged area
  2. Prime with Rayson PrimeBond E20 (primer selection to be confirmed by the Rayson technical team)
  3. Trowel in Rayson MortarBond EM90 and cure before overcoating with the floor system

Limitations

  • Mixed mortar must be placed within its 45-minute pot life at 30 °C
  • Requires a compatible epoxy primer for reliable adhesion
  • Full mechanical and chemical service only after 7-day cure
  • Epoxy chemistry — repairs left uncoated outdoors will yellow

Not suitable for

  • Vertical or overhead repairs — use Rayson PatchBond TX80 thixotropic compound
  • Large-area screeding duties — it is a repair mortar
  • Uncoated exterior exposure where colour stability matters

Used with

Jobs and industries

Jobs that use Rayson MortarBond EM90

Rayson-authorised applicators in Johor, Kuala Lumpur and Penang install Rayson MortarBond EM90 on these jobs and in these industries; its layer is marked in each build-up. You can also order it direct and apply it yourself, with the step-by-step guide. Each page shows how the work runs, what to send for a quotation and what decides the price.

Floor systems, laid by an applicator or bought direct

All floor systems ↗
01 Rayson system Layers: LevelShield SL120 self-levelling epoxy, about 1.6–2.0 kg/m²; PrimeBond E20 primer, 6 to 8 m² per kg; Concrete at least 28 days old, ground, cracks and joints repaired

Self-levelling epoxy flooring

LevelShield SL120 over PrimeBond E20: a seamless floor for forklift aisles, production halls and clean rooms, laid by an applicator or sold direct.

  1. LevelShield SL120 self-levelling epoxy, about 1.6–2.0 kg/m²
  2. PrimeBond E20 primer, 6 to 8 m² per kg
  3. Concrete at least 28 days old, ground, cracks and joints repaired

Repairs first: PatchBond TX80 in cracks and joints, MortarBond EM90 in spalls. Racking zones and store rooms: FloorGuard R50 roller coats over PrimeBond E20. Hot washdown and chemical spillage: PurScreed PC70.

Quoted after inspection

Order it direct, with a step-by-step guide

02 Rayson system Layers: FloorGuard R50, second coat; FloorGuard R50, first coat, 0.3 to 0.5 kg/m²; PrimeBond E20 primer, 6 to 8 m² per kg; Concrete at least 28 days old, ground and vacuumed

Epoxy floor paint

FloorGuard R50 over PrimeBond E20, or water-based HydroShield WE40, sold direct with a step-by-step guide: apply it yourself, or have the applicator do it.

  1. FloorGuard R50, second coat
  2. FloorGuard R50, first coat, 0.3 to 0.5 kg/m²
  3. PrimeBond E20 primer, 6 to 8 m² per kg
  4. Concrete at least 28 days old, ground and vacuumed

Ramps: aggregate broadcast into the first coat for grip. Water-based: HydroShield WE40, its own primer. Porches open to the sun: UraForce SB72 over PrimeBond S30.

Quoted per order

Jobs in Johor

03 Rayson system Layers: LevelShield SL120 self-levelling epoxy; PrimeBond E20 epoxy primer; Concrete slab, ground and moisture-tested

Factory and warehouse epoxy flooring

Forklift aisles, production floors and loading bays in Johor’s industrial parks, specified by the maker.

  1. LevelShield SL120 self-levelling epoxy
  2. PrimeBond E20 epoxy primer
  3. Concrete slab, ground and moisture-tested

Storage halls: FloorGuard R50 roller coat. A light seal coat: HydroShield WE40. Hot washdown or spillage: PurScreed PC70.

Quoted after inspection
04 Rayson system Layers: LevelShield SL120 self-levelling epoxy; PrimeBond E20 epoxy primer; Concrete slab, ground, joints and cracks repaired

Furniture factory floors

Machining halls, timber stores, packing and container loading, finishing lines and buyer showrooms in the furniture factories of Muar and Batu Pahat.

  1. LevelShield SL120 self-levelling epoxy
  2. PrimeBond E20 epoxy primer
  3. Concrete slab, ground, joints and cracks repaired

Timber and board stores: FloorGuard R50. Showroom: R50 under UraForce WB58, or an IFS finish. Finishing lines: after the chemical check.

Quoted after inspection

Jobs in Kuala Lumpur and Selangor

Kuala Lumpur and Selangor ↗
05 Rayson system Layers: LevelShield SL120 in the forklift aisles and loading bays; PrimeBond E20 epoxy primer; Factory slab, moisture- and bond-tested, ground

Epoxy flooring in KL and Selangor

Factory, warehouse, car park, showroom and home floors in the Klang Valley, with the Rayson system named for the traffic.

  1. LevelShield SL120 in the forklift aisles and loading bays
  2. PrimeBond E20 epoxy primer
  3. Factory slab, moisture- and bond-tested, ground

Storage halls, workshops and garages: FloorGuard R50, two coats. Hot washdown: PurScreed PC70. Showrooms: R50 under UraForce WB58. Open porches and top decks: UraForce SB72 over PrimeBond S30.

Quoted after inspection

By industry, across Malaysia

Industries we cover ↗
06 Rayson system Layers: PurScreed PC70 PU-cement screed, 1.5–3 mm; Concrete slab, prepared, coves and drains detailed

Food and beverage factory floors

Hot washdown, wet process and dry store floors for food and beverage plants, with coves and drains detailed.

  1. PurScreed PC70 PU-cement screed, 1.5–3 mm
  2. Concrete slab, prepared, coves and drains detailed

Dry stores and packing: FloorGuard R50 or LevelShield SL120 over PrimeBond E20. Walls: UraForce WB58. Water tanks and effluent pits: SealForce SP210 or SP200, sprayed.

Quoted after inspection
07 Rayson system Layers: FloorGuard R50 sealing coat; FloorGuard R50 broadcast with graded aggregate; PrimeBond E20 epoxy primer; Concrete deck, ground and moisture-tested

Car park floors

Basement, covered and open car park decks, ramps and walkways in condos, malls, offices and factories: textured epoxy, UV-stable PU and deck waterproofing.

  1. FloorGuard R50 sealing coat
  2. FloorGuard R50 broadcast with graded aggregate
  3. PrimeBond E20 epoxy primer
  4. Concrete deck, ground and moisture-tested

Pedestrian walkways: GripSafe AP12. Open top deck: UraForce SB72 over PrimeBond S30. A deck that leaks into the level below: SealForce RC30 under the wearing layers.

Quoted after inspection
08 Rayson system Layers: LevelShield SL120 self-levelling epoxy; PrimeBond E20 epoxy primer; Concrete slab, ground, joints and cracks repaired

Warehouse and logistics floors

Forklift aisles, racking zones and loading bays in warehouses and distribution centres, in self-levelling or roller-applied epoxy.

  1. LevelShield SL120 self-levelling epoxy
  2. PrimeBond E20 epoxy primer
  3. Concrete slab, ground, joints and cracks repaired

Racking and storage zones: FloorGuard R50 roller coats. Heavy traffic with spillage: PurScreed PC70. Broken joints and spalls: MortarBond EM90 first.

Quoted after inspection
09 Rayson system Layers: PurScreed PC70 PU-cement screed, 1.5–3 mm; Slab, old tiles removed, coves and drains detailed

Commercial and central kitchen floors

Cooking lines, dishwash and prep areas in central, hotel and restaurant kitchens: PU-cement where it is hot, epoxy where it is dry.

  1. PurScreed PC70 PU-cement screed, 1.5–3 mm
  2. Slab, old tiles removed, coves and drains detailed

Cold prep, stores and corridors: FloorGuard R50 broadcast with aggregate, over PrimeBond E20.

Quoted after inspection
10 Rayson system Layers: FloorGuard R50 epoxy, two coats; PrimeBond E20 epoxy primer; Concrete floor, degreased, ground and repaired

Workshop and showroom floors

Service bays, wash bays and car showrooms: hard-wearing epoxy in the workshop, a colour-stable finish in the showroom.

  1. FloorGuard R50 epoxy, two coats
  2. PrimeBond E20 epoxy primer
  3. Concrete floor, degreased, ground and repaired

Wash bays and ramps: R50 broadcast with aggregate. Showrooms: UraForce WB58 topcoat over R50. Forecourt: UraForce SB72 over PrimeBond S30. Heaviest bays: LevelShield SL120.

Quoted after inspection
The practical details

Rayson MortarBond EM90: questions people ask

How strong is the cured mortar?

Compressive strength reaches 80 N/mm² at 7 days — several times stronger than typical floor slab concrete.

Does it shrink as it cures?

No — the epoxy binder hardens without shrinkage, so patches stay tight to their edges instead of debonding.

Does the repair need a primer?

Yes, a compatible epoxy primer applied to the prepared repair area. Rayson recommends PrimeBond E20, with final system pairing to be confirmed by our technical team.

How soon can the repair take traffic?

Indicatively hard dry in 16 hours at 30 °C, with full cure and chemical resistance at 7 days. For heavy loading, confirm timing with our technical team.

Can it be feather-edged?

Epoxy mortars perform best at a defined minimum thickness with cut edges rather than feathering. Square-cut the repair perimeter for a durable result.

Start a conversation / ↗

Send the job, or ask for materials

Tell us what the surface is, where it is and what it has to withstand. Rayson replies with a system recommendation; for installation, the applicator for your area in Johor, Kuala Lumpur or Penang is introduced to quote the job.

Malaysia launch: 1 March 2027. Enquiries are welcome now; supply, site assessment and installation timing are confirmed for each project.

Thank you. Your enquiry has been received and we reply within one working day, Monday to Friday.

WhatsApp